5 questions, short answers

Kitchen Remodeling Questions, Answered

These are the questions that come up in almost every Phoenix kitchen conversation, answered in plain terms. If your question is not here, call and ask it directly.

Last updated

01Costs

What does a kitchen remodel cost in Phoenix?

A national cost guide puts a minor remodel at $10,000 to $20,000, a major remodel at $20,000 to $65,000 and a full gut with layout changes at $65,000 to $130,000 or more. A renovation company's review of 1,640 Phoenix kitchen permits found an average declared permit value of about $59,000, which it puts about 27% above its own national average. Published market ranges, not a quote: the final price is set after an on-site assessment. Cabinets, structural work and counters are the lines that move the total most.

Cabinet front and stone samples on a design table with a floor plan, a pencil and a bronze faucet by a desert window

02Permits

Do I need a permit for a kitchen remodel in Phoenix?

The City of Phoenix lists painting, flooring and replacing cabinets or fixtures in existing locations (with no new electrical or structural changes) as work that needs no permit, and adding or moving sinks, electrical updates, gas line changes and wall removals as work that does (City of Phoenix (opens in a new tab)). The city's residential permit guide adds replacing or altering windows to the permit list, and it names protecting your investment and minimizing problems during a future sale among the reasons for permits and inspections (City of Phoenix permit guide (opens in a new tab)).

03Timeline

How long does a kitchen remodel take?

Fixr puts the average full kitchen remodel at 6 to 12 weeks, and at 3 to 8 months when load-bearing walls come out or water and drain lines move. Cabinet lead times and permit review are the 2 biggest schedule drivers: Fixr lists 1 to 2 weeks for stock cabinets, 4 to 8 weeks for semi-custom and 3 to 6 months or longer for custom. A cosmetic update can take a week or two. The schedule that matters lists material dates, inspection dates and a decision deadline for each finish. Heat and monsoon storms can slow exterior work such as a patio door or a stucco patch.

Slim pale stone worktop on an oak kitchen island with a recessed grip rail and a polished concrete-look floor

04Timeline

Can I live at home during a kitchen remodel?

Many homeowners do, especially during a refresh. During a full remodel the kitchen is unusable for several weeks, so set up a temporary sink, microwave and refrigerator in another room. A sealed plastic wall at the kitchen opening and a fan pulling air out of a window keep dust out of the rest of the house. Plan for the demolition days to be the worst, and change the HVAC filter when the work ends. Set up a temporary kitchen with a refrigerator, microwave, kettle and a dish tub, and keep paper plates for the worst week. The goal is not comfort. It is keeping the family out of the work zone. Keep the refrigerator in the dining room and label the boxes by room, so the house stays livable instead of turning into a storage unit.

Two people looking at cabinet and stone samples on a kitchen table, one wearing an ivory polo with a KR monogram

05Cabinets

Which cabinets hold up best in Arizona?

Solid wood or plywood boxes with quality hardware hold up better than particle board, especially near a sink or a sun loaded window. Thermofoil can peel at the edges in heat, and low end painted finishes can yellow. In a west facing kitchen, choose a lighter color and a UV stable finish, and plan window coverings. Drawer glides matter more than the door profile for daily use. The box, the door and the finish matter more than the price tag. A sample door left in the kitchen for a week shows the finish in your own light, because showroom light hides a lot. A finish that looks warm under store lighting can look yellow in a west facing room. Look at the edge banding where the door meets the box, because that is where cheap cabinets fail first in dry heat.

06Countertops

What is the best countertop for a Phoenix kitchen?

Quartz is the common choice: non porous, consistent and easy to clean. Granite handles heat and needs sealing. Quartzite is hard and natural but often priced higher. In a kitchen with direct sun, lighter surfaces show less dust and water spotting. In a kitchen where hot pans land on the counter, heat tolerance matters more than pattern. Look at a real slab in daylight before you choose. Seams are a fabrication decision, and where they land is set before the slab is cut. A seam through the middle of the sink run is visible every day. A showroom has different light than your kitchen at 4pm in July. A surface that looks soft in the store can look gray on a west wall.

Graphite handleless kitchen with a long pale island, an oak dining extension and a courtyard window with desert trees

07Costs

How should I budget a kitchen remodel?

Start with the 3 scopes and pick the one that matches the house. Price cabinets and counters first, because they are the 2 biggest lines. Fixr suggests setting aside an additional 5% to 10% of the total budget for surprises, and an older house may need more. Keep the contingency in its own line. Decide what stays before you price what changes. A written scope with allowances and exclusions makes a budget easier to check. The contingency is what lets you finish the kitchen when the wall opens up and the wiring is wrong. Write the budget in 3 columns: must do, want to do and later. The later column is what keeps the must do column funded when a surprise shows up.

Compact galley kitchen with graphite lower drawers, oak tall cabinets, a woven runner and a clerestory window

085 questions

Questions people ask

Still have a question? Call (747) 243-2089 and describe the kitchen.

01

Is an island always possible?

No. An island needs clearance around it, and a small kitchen with a walkway on 2 sides may not have room. A peninsula often works better. Measure the aisle before you fall for the layout.

02

Do I need an interior designer?

Not always. A designer can help with finish selection and drawings, especially in a large or unusual room. Structural questions go to an engineer, and permit questions go to the city.

03

Can I keep my appliances?

Yes, if they fit the new openings and still work. Keep the measurements of every appliance before cabinets are ordered. Replacing a fridge later is easy. Making a cabinet opening bigger later is not.

04

What if my kitchen is small?

Small kitchens get the most value from storage, light and better counters rather than an island. Drawers instead of doors, uppers to the ceiling and under cabinet lighting change a small room more than a new footprint.

05

What changes in a condo kitchen remodel?

Condo kitchens add building rules: work hours, elevator reservations, plumbing access and sound transmission. Those rules are workable, but they need to be known before the schedule is set.

Cabinet installer in a charcoal KR polo kneeling to adjust a hinge on an oak kitchen cabinet

Your kitchen project

Next step

If your question is about your own kitchen, call with the age of the house and the thing that bothers you most.

Pick the service if you have one in mind, then leave your name, number and ZIP code. Someone will call you back to talk it through.

Thank you. You will be called back soon.

Type of service you want (optional)
Prefer to call?Call (747) 243-2089
Talk about your kitchen project(747) 243-2089

Before you go: want a call back?

Leave your name, phone number and ZIP code, and someone will call you back about your kitchen.

Thank you. You will be called back soon.

Or call (747) 243-2089